Skip to content
All services

Post-construction cleaning

Handover cleaning for finished builds and fit-outs. Construction dust settles for days after the trades leave, so we work in passes rather than one sweep, and the final pass happens right before you hand over the keys.

Typical turnaround: Two to four passes depending on site size

Newly built interior with bare concrete floors before handover

What is included

  • Debris clearance and coarse sweep
  • Cement haze, grout film and adhesive residue removal
  • Paint spots and silicone lifted from glass, tile and fittings
  • Protective film peeled from joinery, appliances and glazing
  • Multiple fine dust passes through ceilings, vents, tracks and voids
  • Glass, frames and balustrades cleaned inside and out where reachable
  • Final polish pass timed to handover day

Suited to

  • New apartment and villa handovers
  • Retail and restaurant fit-outs
  • Office refurbishments
  • Resort room refurbishment programmes

About post-construction cleaning

When should we book you in?

Book the first pass as soon as the trades are out, and the final pass for the day before handover. Dust keeps falling for days, so a single clean too early always disappoints.

Tell us what needs cleaning

Send the property type and the rough size. We will come and survey it, usually within a day or two, and send a fixed price after that.